www.bashkortostan-export.com
Russian
NEWS
ABOUT REPUBLIC
BASKORTOSTAN HONEY
About Bashkirian honey
Honey «Good Spirit»
Honey «Health»
Creams «Magic Bee»
EXPORT ABILITIES
Fuel, Chemical and Petrochemical Industry
Black and Colored Metallurgy, Machinery Engineering and Metal Processing
Timber Industry
Glass Production and Medical Industry
Consumer Goods Production and Food Production
INVESTMENT-PROJECTS
Investment cooperation
Oil-extracting, chemical and oil chemical industry
Ferrous and non-ferrous metallurgy, mechanical engineering and instrument production
Wood processing industry and construction
Glass-working and medical industry
Light and food-processing industry
Electric power industry and transportation
Small business entities projects
FOREIGN TRADE
PLACE AN ORDER
FAQ
CONTACT

 Ferrous and non-ferrous metallurgy, mechanical engineering and instrument production

Ferrous and non-ferrous metallurgy

JSC «Bashkirian copper-sulfur integrated plant»
Supply of exhausted capacities and basic spheres of investment activity
Total project cost — 61 834 000 USD
Required investments — 22 357 000 USD
Payback period, months — 108
Current status
Complex mining and ore dressing production have been set up. There are necessary supply lines.
The project's summary
The project is aimed at complete production updating. A cyanide free technology of copper zinc ores is used. This technology allows increasing manufacturing safety and reducing wastewater pollution.
The stage-by-stage development program of «Jubileinoye» and «Podolskoye» fields located 80 kms far from the works has been elaborated. The draft drawing of the mining part of the project has been worked out.
Firstly,the plant is intending to develop open-cut mine of the top of the «Jubileinoye» field. According to evaluations, it contains ore deposits with the contents 1.55% of copper and 0.74% of zinc with associated gold of 1.2 gr/tn and silver of 16.0 gr/tn.

JSC «Byeloretsk Metallurgical Plant»
Reconstruction of steel smelting production
Total project cost — 65 265 000 USD
Required investments — 65 265 000 USD
Payback period, months — 108
Current status
Mine management, blast furnace and martin shops,rolling mill, 11 hardware shops are under operation in the plant. It is supposed to replace existing metallurgical units by electro steel melting complex equipment.
The project's summary
The investment project stipulates change of steel production method by installing new equipment and units.
Production units’ re-structuring will allow for the factory to take leading position in hardware industry of Russia. A stage-by-stage realisation of the project using the existing equipment and structures of metallurgical production is supposed.
The first stage stipulates construction of a «ladle — furnace» unit and construction of a part of an industrial building (10,3 mln USD), the second stage — erecting a machine of continuous bars casting (15,1 mln USD), the third stage — construction of an electric arc furnace with a mine heater and objects of infrastructure (39,9 mln USD).

Mechanical engineering and instrument production

Joint stock company «Blagoveschensk fittings plant»
Putting into operation of the shop for production of wedge gate valves
Total project cost — 20 000 000 USD
Required investments — 20 000 000 USD
Payback period, months — 48
Current status
An uncompleted building of industrial shops is ready at 20%, conserved.
The project's summary
The project stipulates completing construction of industrial shops with total area of 6000 m 2 and making up the shop with necessary production equipment.

State enterprise «Ghydravlika»
Expansion of bellows equalizers of large diameters production
Total project cost — 7 600 000 USD
Required investments — 1 700 000 USD
Payback period, months — 48
Current status
Research, experimental and design works to make an experimental sample are being carried out.
The project's summary
The project is urgent due to favourable economic outcome from applicating bellows equalizers of large diameter in various pipelines. It makes possible to considerably reduce costs of installation, operation and repairing compensatory units, to save the materials’ area, and to increase safety and operating life of pipelines.

JSC «Neftekamsk automobile plant»
Establishing production of city passenger buses
Total project cost — 14 267 500 USD
Required investments — 12 854 460 USD
Payback period, months — 60
Current status
The production building for city buses is under construction.
The project's summary
The company plans to master production of city buses in 2000–2006 with perspective output of 1000 buses per year since 2006. The buses are to be of highest quality with the price 60000 USD.

JSC «Salavat optics and mechanical plant “Berkut”»
Production of optical medical devices
Total project cost — 21 553 000 USD
Required investments — 21 553 000 USD
Payback period, months — 32
Current status
The technology has been elaborated; quality-monitoring system meets world standards.
The project's summary
The project stipulates production of inexpensive, quality medical devices meeting world standards. The enterprise’s advantage is possibility to manufacture workpieces in large scale due to special arrangement of shops and equipment to considerably reduce costs per production unit.

JSC «Tuimazy plant for truck-mounted concrete mixers»
Establishing production of truck-mounted foam lifts
Total project cost — 1 732 955 USD
Required investments — 645 952 USD
Payback period, months — 38
Current status
Elaborating engineering specifications is to be completed.
The project's summary
Truck-mounted foam-lift fire engine APP-32 is intended for transporting a fire crew to the place of fire and necessary equipment, air and mechanical foams supplying while putting out fire in hard to reach places up to 32 meters high, supplying powerful compact or sprayed water up to 32 meters high.

State company «Ufa aggregate production association (UAPO)»
Production of automobile spark plugs of ignition at world level
Total project cost — 5 000 000 USD
Required investments — 4 640 000 USD
Payback period, months — 52
Current status
Production of ceramic cores running.
The project's summary
The automobile spark plugs of ignition with noise-eliminating resistor, improved appearance (covered by bright solid nickel) have advanced consumer characteristics: wide range of heating feature, high resource of reliable operation, high efficiency and ecological purity of engine operation.

State company «Ufa aggregate production association (UAPO)»
Mastering production of new type of self-priming pumps of NSU type for dairy, food and processing industries
Total project cost — 1 940 000 USD
Required investments — 586 000 USD
Payback period, months — 27
Current status
Design documentation elaborated, experimental samples made, tests conducted.
The project's summary
The manufactured goods are for pumping milk and dairy products with temperature not more 95 °C.
Maximum volume of pumping — 5–7 m3/hour, maximum head — 11–20 m, depth of self-priming — 5 m, input — 0,7–0,8 kwt, weight — 13–13,5 kg.

State company «Ufa aggregate production association (UAPO)»
Mastering production of spark plugs of incandescence for diesel automobile engines
Total project cost — 1 500 000 USD
Required investments — 1 200 000 USD
Payback period, months — 33
Current status
Experimental and design documentation elaborated.
The project's summary
It takes not more 8 sec. to heat up to 950 °C. Volume of intake current by spark plug: at the moment of switching on — not more 28 A, in 8 sec. — not more 10 A. The fixed operating life is 350 thousand kms of automobile run.

State company «Ufa aggregate production association (UAPO)»»
Mastering new series of explosion-proof electric engines
Total project cost — 974 000 USD
Required investments — 687 000 USD
Payback period, months — 32
Current status
Explosion-proof electric engines by 1,5...5,5 KW, 50 Hz power were developed and are produced.
The project's summary
The project stipulates expanding production of asynchronous explosion-proof electric engines. Explosion-proof marked as 1ExedPVT4.
The products are for using in enterprises of oil and gas industries, as well as oil and gas pipelines.

State company «Ufa aggregate production association (UAPO)»
Mastering new series of NSU type pumps for petrochemical industry
Total project cost — 538 000 USD
Required investments — 388 000 USD
Payback period, months — 31
Current status
It is required to complete design documentation.
The project's summary
The production is designed for pumping petrochemical products in 2 ways: standard industrial and explosion-proof.
Maximum volume of pumping — 4–5 m3/hour, maximum pressure — 15–18m, depth of self-pumping — 5 m, input — 0,7 kwt, weight — 13–15 kg.

JSC «Ufa engine-building production association (UMPO)»
Establishing production of turbojet ducted-fan engines
Total project cost — 32 200 000 USD
Required investments — 31 400 000 USD
Payback period, months — 52
Current status
D-436T1/TP engines were developed by design bureau «Progress», Zaporozhye, the Ukraine and are to be produced together with JSC «Motor-Sitch», Zaporozhye and «Salyut» enterprise, Moscow.
Business–plan has been developed; the preproduction is in progress.
The project's summary
As a multi-purpose amphibian Be-200 is being developed, the need arises in producing turbojet ducted-fan engine D-436T1/TP. It will have guaranteed sales.



Rambler's Top100