www.bashkortostan-export.com
Russian
NEWS
ABOUT REPUBLIC
BASKORTOSTAN HONEY
About Bashkirian honey
Honey «Good Spirit»
Honey «Health»
Creams «Magic Bee»
EXPORT ABILITIES
Fuel, Chemical and Petrochemical Industry
Black and Colored Metallurgy, Machinery Engineering and Metal Processing
Timber Industry
Glass Production and Medical Industry
Consumer Goods Production and Food Production
INVESTMENT-PROJECTS
Investment cooperation
Oil-extracting, chemical and oil chemical industry
Ferrous and non-ferrous metallurgy, mechanical engineering and instrument production
Wood processing industry and construction
Glass-working and medical industry
Light and food-processing industry
Electric power industry and transportation
Small business entities projects
FOREIGN TRADE
PLACE AN ORDER
FAQ
CONTACT

 Glass-working and medical industry

Glass-working industry

JSC «Salavatsteklo»
Production of glassware — beer bottles
Total project cost — 38 500 000 USD
Required investments — 38 500 000 USD
Payback period, months — 56
Current status
Feasibility report elaborated.
The project's summary
The project is aimed at producing beer bottles by capacity of 0,33–0,5 liters out of stained glass. The annual output will make 400 mln bottles corresponding to European high technical standards of quality. The project stipulates purchase and installation of imported production equipment.

JSC «Salavatsteklo»
Production of emissive glass
Total project cost — 6 000 000 USD
Required investments — 6 000 000 USD
Payback period, months — 36
Current status
Feasibility report elaborated.
The project's summary
The project aims to produce glass with high transmission factor in visible light spectrum and high reflection of heat radiation.

JSC «Salavatsteklo»
Establishing production of sheet glass at a minifloat line
Total project cost — 29 700 000 USD
Required investments — 26 800 000 USD
Payback period, months — 52
Current status
Feasibility report elaborated.
The project's summary
The project aims to produce sheet glass of the M1-M7 brands of 2–12 mm thickness, heat-absorbing glass. The annual glass output makes 8800 thousands m2. To realize the project it is necessary to construct glass-making furnace, and purchase production equipment.
To arrange the equipment reconstruction of the acting industrial building and expansion of auxiliary objects should be done.

JSC «Salavatsteklo»
Production of heat-proof gaskets
Total project cost — 5 000 000 USD
Required investments — 5 000 000 USD
Payback period, months — 36
Current status
Feasibility report elaborated.
The project's summary
The project aims at production heat and soundproof mats and plates out of fiberglass used for insulation of roofs, dividing walls, frame panels, equipment and pipelines.

JSC «Salavatsteklo»
Production of hardened glass
Total project cost — 4 400 000 USD
Required investments — 4 400 000 USD
Payback period, months — 44
Current status
Feasibility report elaborated.
The project's summary
The project aims at production of hardened glass (stalinite) at the industrial premises available. The project stipulates purchase of a line manufacturing hardened glass to make a spherical surface and with elements of silk stenciling, and a line manufacturing bulky float glass of different thickness.

JSC «Salavatsteklo»
Establishing production of triplex
Total project cost — 2 400 000 USD
Required investments — 2 400 000 USD
Payback period, months — 30
Current status
Feasibility report elaborated.
The project's summary
The project aims at production and sale of three kinds of triplex: safe wind automobile three-layer glasses, constructing triplex, safe bullet-proof multi-layer triplex to sustain shots of fire-arms for collector and other specialized cars, offices, banks.

Medical industry

State scientific production association «Immunopreparat»
Establishing production of preparations under GMP international requirements
Total project cost — 40 000 000 USD
Required investments — 40 000 000 USD
Payback period, months — 60
Current status
Construction of the building is under completion. The first stage needs 20 mln USD.
The project's summary
To implement the project the production building is under construction, which is expected to have production unit corresponding to GMP requirements to realize the produce for export.
The technologies and equipment to be installed in the unit will allow changing operatively the range and output of the products. The project’s implementation will allow expanding the production range, and also diversifying shapes of producing preparations in order to improve consumer properties.
The enterprise is going to make vaccines (8 kinds), preparations of human blood (9 kinds), injection preparations (10 kinds).

JSC «Belebey dairy integrated plant»
Construction of shop for medical preparations
Total project cost — 5 500 000 USD
Required investments — 5 500 000 USD
Payback period, months — 36
Current status
The shop ’s building is constructed at 85%; 20% of the equipment has been bought.
The project's summary
The plant produces intravenous solutions for medical institutions of the republic.
The project aims at full equipment replacement by more modern one, corresponding to requirements for producing infusion solutions of 5 mln bottles per year. It is necessary to purchase a line of bottling and corking medical preparations into polyethylene bottles.